The FS operated this 760mm gauge line which built by the Austrians during the First World War. The 32km long line linked Chiusa on the Brenner line with Plan some 1595m above sea level, the highest station in the country, until the line closed in May 1960.
To view any full size image and caption details please click the maroon button below each thumbnail